Comprehensive investment
implementation, from design through
selection of materials, to execution and warranty service.

SERVICES

Our company has been greatly appreciated by our customers who rely on the high quality of our services and the products we offer. Constant training and improvement of our staff guarantee professional performance of the more and more complicated challenges we undertake.

We execute works connected with the construction of heating networks, gas supply systems, water and sewage systems. We also create technological pipelines, ice water installations, vapour, condensate, compressed air and thermooil systems.

WE OFFER:

external and plumbing networks with full diameter cross-section

District heating networks and pre-insulated pipes

heating networks made of black steel pipes and in reinforced concrete channels

internal installations
any technology

land drainage

construction of reservoirs and storage tanks, pumping stations

reconstruction of the surface after the work done

air conditioning installation with assembly and equipment

small, reinforced concrete structures on external networks

REALIZATIONS

Comprehensive investment
implementation, from design through
selection of materials, to execution and warranty service.

09.2023

Czarnieckiego
Reconstruction of the heat pipeline as part of the investment at Czarnieckiego 31 Street in Wrocław

07.-09.2023

Lubin
Reconstruction of the DN 350 main network at Streets: Niepodległości, Bankowa & Armii Krajowej in Lubin

07.-09.2023

Lubin
Reconstruction of the heating network from traditional technology to pre-insulated technology in the area of ​​Cedyńska Street in Lubin

07.-09.2023

Gajowicka/Saperów
Reconstruction of the heating network with heating connections in traditional technology to a pre-insulated network in the area of ​​Gajowicka Street and Saperów Street in Wrocław

2022-2023

Siechnice
Reconstruction of the heating network 2xDN700/900 mm and 2xDN300/450 mm at the heat and power plant in Siechnice

2022

Kanonia
Heating connection 2xDN100/200 mm to the existing building at Kanonia Street 12-14 in Wrocław along with the construction of a sewage connection draining the heat connection

2021-2022

Zielona Góra
Construction and reconstruction of the main heating network 2xDN400 / 560mm in Zielona Góra

2021

Gnieźnieńska
Construction of a heating network 2xØ914/1100 mm - 2xØ813/1000 mm with drainage 2xØ139.7/225 mm and dismantling of the inactive sewer network for the investment at Gnieźnieńska Street in Wrocław

2019 - 2021

Zielona Góra
Reconstruction of the heat network at Streets: Zjedoczenia,
Zacisze, Batory, Ludowa, Węglowa, Wyszyński in the range of diameters: 2xDN500 / 710 - 2xDN300 / 450

2018

Niedźwiedza
Reconstruction of the heating network 2xDn813 / 1000, 2xDn219.1 / 315 and the heating node 1671 KW

2017

Fabryczna
Reconstruction of the heating network 2xDn700 / 900

2016

West Link
Reconstruction of the heating network 2xDn200 / 315

2016

Strzegomska/Gubińska
Reconstruction of the heating network 2xDn500 / 630

2016

Sikorskiego
Construction of a heating connection 2xDn65 / 140

2016

Piękna
Reconstruction of the heating network 2xDn200 / 315

2016

Legnicka 49
Reconstruction of the heating network 2xDn800 / 1000

2016

Krakowska
Construction of a heating connection 2xDn65 / 140

2015

Modernization of the Water Reservoir No. 1 at ul. Na Grobli in Wrocław - Hydropolis facility
Implementation: May 2014 - October 2015

2015

Construction of a pre-insulated DN350 heating network in the area of ul. Licealna and al. Jerozolimskie in Brzeg Dolny

Implementation: 07 - 09.2015

2015

Performing the replacement of fittings in the chambers:
K-III/1 i K-IV/1 we Wrocławiu

Implementation: 09.2014 - 06.2015

2015

Construction of a parking square with accompanying infrastructure for MPK Wrocław buses at ul. Obornicka - reconstruction of the heating network

Implementation: 06-2014 - 04-2015

2015

Preparation of land development preparatory works - Stage 0 Preparation of land development preparatory works - Stage

implementation: 07-2014 - 02-2015